Basement Remodel
Redmond
This full basement remodel was completed in three weeks. The Everest team added a new kitchen, installed a heated tile floor, updated the bathroom and painted the interior walls.
ClientMustafa F.Date2022Design byUlle Studio Interior DesignLocationRedmondShare